Tuesday, 24 March 2015

Catch-up number 5

I'm hoping to make this the last of the catch-ups, and then you can safely assume that all we are doing is "normal" living type activities.  I may still blog when we've made a visible difference outside, or when I've finally found homes for all our possessions, but I'm not planning to do a daily post...

Unless I spot a new/interesting bird - that might get me to the computer.

Here goes:
  • Wednesday, 25 February: I got a second coat of paint on the wall that will be behind the stove - that's enough already!

Monday, 23 March 2015

Catch-up number 4

In the excitement of moving, blogging has really taken a back seat.  I finally got the photos all uploaded to Flickr, so my mind is now empty enough that I can face wading through my notes, so I'm [finally] pushing on with updating this blog.

Here goes:
  • Saturday, 7 February: The plasterer has done a good job of the wall where the woodburning stove will go, and it's already dry/nearly dry everywhere apart from where Glyn blocked up the old opening/around the flue.  Both Richards have finished - the utility room now only needs the lights reinstating, and a washing machine to be complete.  David sanded the remaining unsanded coving in the kitchen, and all of the hall - phew!  That's all we are going to do sanding-wise, as we are fast running out of time.  I painted a second coat on the second quarter of the sitting room ceiling, and started the first coat on the third quarter.  I'm still being "hamstrung" by the shoulder problems, so am doing as much as I can without making my shoulders so bad I need to take time off; we figure a little bit of work every time we come is better than doing eight hours and then being unable to do anything for months.  Later, I finished the first coat on the third quarter, but keeping track is fun!

Friday, 27 February 2015

We've moved!

I'm crazy-busy trying to get at least one room habitable [hamstringing myself by flitting between rooms], and haven't got the mental space to do the 'update so far'...

So, today, I'll just say: we have the hearth, I'm waiting for the stove [next Thursday is the installation date], I'm cleaning the sitting room floor & windows (trying to get one area vaguely clean before the herd of cats* female relatives descend next week)...

Right, I'm off to use more Flash!



*It's like herding cats, interacting with that side of the family, so I think of them as a 'herd of cats'!

Monday, 2 February 2015

Still playing catch-up...

I'm wading my way through my notes from the last month, so here is another instalment of progress that's happened at the house:
  • Saturday, 17 January: Richard 2 has been.  We've now got a shower tray, base cabinets, and worktops in the utility, and about three-quarters of the tiling has been done.  For the first time, I can "see" myself liking living in this house [as opposed to living in the house until I can make enough changes that it feels bearable (the downside of buying a place for the exterior when the house is a sh!thole, I suppose)].  That felt like an immense breakthrough, and I've felt so much more positive since.  Thank you so much!  He has also connected the loo to the mains, but until Richard 1 has finished his ministrations we are still reliant on our bucket.  Jason fitted the sliding kitchen door into the final position; that's him done for now.  David continued removing wallpaper paste from the sitting room walls, and I started sanding the cornice, and painted behind where the radiators will be in there.

Friday, 30 January 2015

Catching up, again

We had a wonderful respite in France over Christmas and New Year, and came back invigorated and raring to go...

If you believe that, you'll believe anything!

Seriously, the break was much needed, and much appreciated, and staying in a warm house was a huge relief after travelling from a cold house to an even colder one.  Still, we're back to that [for now].  Our hand-over date is getting ever closer, and we have decided to prioritise the sitting room and utility, so that we have a room in which to live, and another that will function as kitchen/bathroom.

In the intervening month, that plan has been scaled back, as (unfortunately) three of the walls in the sitting room need skimming.  The fireplace wall should be done on Tuesday, but I'm holding off engaging a plasterer for the other two until we know whether TV reception means that we need to chase out for a replacement aerial, and that will only happen once we've moved in.